Features

One coherent system.
Many modules.

Every module does one thing well and talks to the others. No plug-ins. No configuration. No consultants. New ones ship as the work demands them.

FREE Defects

Every defect. Every photo. Closed out.

The defect register isn't a spreadsheet. It's the record you defend in closeout. Strova makes it fast to raise, impossible to lose, and clean to report.

Field-first captureRaise with photos in 20 seconds on any phone.
Rectification trailEvery change logged. Who raised, who closed, who saw what.
Branded PDF reportsClient-ready register in one click. Photos embedded, status flagged.
defects / D-047
D-047 Protection relay cabling Incorrect termination · HV Yard CRITICAL PHOTOS (3) RECTIFICATION TRAIL Raised by S. Mills 12 Mar · photos attached Assigned to T. Walsh · Elecnor 12 Mar · notified via email Rectification submitted 14 Mar · 2 photos, awaiting review Accept & close Reject & reissue
actions
Action register 23 open · 4 overdue + New action OWNER ACTION DUE STATUS JC James Chen Confirm relay settings for F1/F2 From Meeting 14 · linked RFI-004 21 Mar · 3d over OVERDUE SM Sarah Mills Issue revised SLD drawing From Variation VAR-003 24 Mar OPEN TW Tom Walsh Close out Defect D-043 Auto-raised from Defects 26 Mar OPEN RN Rob Nguyen Circulate protection philosophy Completed 18 Mar 20 Mar DONE MH Mike Harding Review cable schedule R-B 28 Mar OPEN
FREE Actions

Who owes what. By when.

Actions get lost in emails and meeting notes. Strova makes them first-class: every action has one owner, one due date, and one status - and it's visible to everyone.

Linked to everythingRaised from meetings, RFIs, variations, defects - or stand-alone.
Overdue, visibleTraffic-lit by default. No chasing. No excuses. No surprises.
Email notificationsEveryone stays in their inbox. Strova chases for you.
FREE Meetings

Minutes that write themselves.

Start the meeting, pick the attendees, type as you go. Decisions become decisions. Actions flow straight into the Actions module. Minutes are ready to issue before the meeting ends.

Structured templatesSite, progress, design, commercial - pick one and start typing.
Action capture inlineMark any line as an action. Assigns, dates, notifies. Done.
Issue as PDFOne click out. Signed off, in everyone's inbox, before you leave the room.
meetings / M-014
M-014 Site Progress - Week 14 19 Mar 2026 · 09:30 AEDT · Upper Tumut ATTENDEES (5) JC SM TW RN MH MINUTES 3.1 HV Bay progress Cable pulls complete. Termination to commence Mon 24. 3.2 Open RFIs RFI-004, RFI-005 requires Transgrid response by 21 Mar. ACTION James to chase Transgrid · due 21 Mar Issue minutes PDF + Add agenda item
documents / STR-P0030317-EL-001
STR-P0030317-EL-001 Protection Relay Settings Electrical · 3 revisions · Current: Rev C REVISION HISTORY Rev C Issued for Construction 19 Mar 2026 · via TRX-0023 · 2 comments closed CURRENT Rev B Issued for Review 14 Mar 2026 · via TRX-0019 · 4 comments Rev A Issued for Review 5 Mar 2026 · via TRX-0012 · superseded Upload new rev View PDF Issue transmittal
FREE* Documents

Controlled revisions. Traceable issues.

Every document has a history: who issued it, who reviewed it, what changed between Rev A and Rev C. Link documents to transmittals, RFIs, and defects - so nothing sits in isolation.

Revision controlRev A → Z. Superseded versions preserved. Nothing overwritten.
Discipline-taggedElectrical, civil, mechanical, controls - filter and report by trade.
Free tier: 100 filesUpgrade to Pro for unlimited storage and transmittal integration.
PRO Site

Every contractor. Every certificate. Current.

Personnel records, inductions, insurances and SWMS in one module. Know which contractor's PL insurance expires next Friday, whose induction is lapsing, which SWMS hasn't been submitted - before it becomes a site-stop problem. The daily register writes itself.

Personnel & inductionsDaily sign-in register. General site, project-specific, white card, HRWL - all with expiry alerts.
Insurances trackedPublic Liability, Workers Comp, Professional Indemnity. Expiry warnings weeks ahead, not days.
SWMS workflowSubmit, review, approve, track. Every high-risk task, properly documented - ready for WHS audit.
site / compliance
Site Compliance Upper Tumut · 4 contractors · 27 personnel Export compliance pack ON SITE NOW 14 EXPIRING · 14 DAYS 3 SWMS ACTIVE 12 Overview Personnel Inductions Insurances SWMS CONTRACTOR INDUCTIONS INSURANCES SWMS STATUS V Ventia 8 personnel ✓ 8 / 8 ✓ CURRENT ✓ 3 ACTIVE E Elecnor 12 personnel ⚠ 11/12 · EXP FRI ✓ CURRENT ✓ 5 ACTIVE S Subbie Co 4 personnel ✓ 4 / 4 ⚠ PL EXP · 14 D ✗ 0 ACTIVE P PowerCor 3 personnel ✓ 3 / 3 ✓ CURRENT ✓ 2 ACTIVE
PRO Transmittals

BCC an email. It's already a transmittal.

The transmittal problem isn't tracking - it's getting the data in. Strova gives every project a unique BCC address. Copy it on any email and Strova extracts the attachments, sender, subject, and recipients into a full transmittal record. No double entry. No training.

Zero-friction captureWorks with Outlook, Gmail, Apple Mail - any email client.
Attachments auto-indexedDocuments linked to the transmittal. Revisions inferred where possible.
Parallel and sequential flowsFor Review & Comment, For Information, For Approval - all handled.
transmittals / inbox
EMAIL From: sarah.mills@ventia.com.au To: james.chen@transgrid.com.au BCC: upper-tumut@in.strova.app Subject: Rev C - SLD for review Hi James, attached is Rev C of the SLD for your review. Please comment by 26 Mar. Regards, Sarah. STR-EL-002-C.pdf 2.4 MB AUTO TRX-0023 ISSUED Rev C - SLD for review From: Sarah Mills (Ventia) To: James Chen (Transgrid) PURPOSE For Review & Comment DUE 26 Mar 2026 DOCUMENTS (1) STR-EL-002 Rev C ✓ Linked to STR-EL-002 ✓ Document Rev C created ✓ Comment window open
PRO Inbox

Every email, in its place.

Transmittals are formal. The rest of your correspondence isn't - but it still matters. Inbox captures every email BCC'd to the project, categorises it by type, and lets you link it to the record it belongs to. Six months later, when you're building a variation claim, the evidence is one search away.

Auto-categorisedTechnical, RFI, Commercial, Safety, Programme, Contractual, General - pick or auto-tag.
Linked to recordsAttach emails to RFIs, variations, defects - builds the evidence trail automatically.
Searchable foreverAny keyword, sender, date, thread. Attachments indexed. No more "search my Outlook".
inbox
Inbox 48 this month · 4 unlinked Search emails… All · 48 Technical · 12 RFI · 8 Commercial · 5 Safety · 3 Programme · 6 Contractual · 4 Rev C SLD - for review sarah.mills@ventia.com.au · 2h ago TECHNICAL → TRX-0023 1 Response to RFI-004 - earthing clarification james.chen@transgrid.com.au · yesterday RFI → RFI-004 VAR-003 - approval confirmation rob.nguyen@transgrid.com.au · 3d ago COMMERCIAL → VAR-003 Site hours change - daylight savings m.harding@powercor.com.au · 4d ago PROGRAMME
rfis / RFI-004
RFI-004 AWAITING Earthing scheme clarification Raised by S. Mills · assigned to J. Chen (Transgrid) QUESTION Rev C shows Class B earthing on the 132kV bus. Spec section 4.3.2 calls for Class A. Please confirm which is correct before we proceed with terminations. LINKED TO STR-EL-001 Rev B SLD · Clause 4.3.2 RESPONSE DUE 3d overdue Was due 21 Mar Raised 18 Mar · 11:42 Notified 18 Mar · 11:42 Reminder sent 22 Mar Chase response
PRO RFIs

Every query, tied to its source.

RFIs live and die by context. Strova links every RFI to the document, drawing, clause or area it came from - so the person answering has everything they need, and the person chasing has everything they need too.

Source-linkedPin to a document revision, a drawing, a spec clause - or all three.
Auto-chasingStrova chases for you when responses are overdue. No awkward phone calls.
Cost/time flaggingMark RFIs that impact cost or programme - flows straight into Variations.
PRO Variations

Defend your claim. Without the folder.

Variations live or die on the evidence trail. Strova captures cost, time and scope impact with the supporting RFIs, instructions, emails and photos already linked - so your variation isn't a claim, it's a file.

Cost and time impactLabour, materials, plant, programme - structured, defendable.
Evidence trailEvery linked RFI, SI, email and photo bundled into the submission.
Client-ready submissionIssue as PDF with cover letter and attachments. Nothing missed.
variations / VAR-003
VAR-003 Additional HV switching programme SUBMITTED COST IMPACT +$48,200 Labour, plant, overhead TIME IMPACT +6 days Critical path affected SCOPE Added Out of original scope EVIDENCE TRAIL (5) RFI-004 Earthing clarification SI-002 HV isolation sequence TRX-0019 Revised SLD issued Email Transgrid approval Photos 12 on-site photographs · as-built evidence Submit to client →
site-instructions / SI-002
SI-002 ACK'D HV isolation sequence - Feeder F1 Issued 17 Mar 09:14 · T. Walsh (Elecnor) LOCATION HV Yard · Bay 3 · Feeder F1 isolator INSTRUCTION Before any live work on F1, isolate at upstream source only (per Transgrid procedure TX-042). Apply danger tags. Verify dead before approach. ✓ ACKNOWLEDGED TW Tom Walsh · Elecnor Supervisor Acknowledged on site · 17 Mar 09:28 · signed MH Mike Harding · PowerCor HSE 17 Mar 09:31 · signed
PRO Site Instructions

Issued from the field. Signed on the spot.

Site instructions don't wait for the office. Strova lets supervisors issue an SI from their phone, tag the exact location, and capture acknowledgement in real time. The paper trail was never a trail - it's a database.

Location-taggedArea, asset, discipline - all structured, all filterable.
On-site acknowledgementDigital signature. Timestamped. Non-repudiable.
Links to variationsIf it costs money or time, it feeds into the Variation automatically.
PREVIEW · v0.1 Construction Lookahead

The live planning tool for high-performing supervisors.

A planning tool for site personnel to capture how the operation actually runs. Drag-to-build the rolling 3-month plan, and personnel, key dates and resource demand calculate from the activities themselves. No separate spreadsheet to keep in sync - the plan and the record are the same thing.

Drag-to-build calendarRolling 3-month or week view. Click to add, drag to move. Configurable work streams and activity types, each with their own colour.
Resources auto-rolledPersonnel header table and key dates row. Resource rows recalculate live from the activity blocks above. No double entry.
A3 PDF for the toolboxPrint-ready A3 export for site meetings. Supervisor and Viewer roles control who can edit vs read.

v0.1 - initial draft. We'll run a discovery session before the next iteration, the same way we did for Documents.

lookahead / 3-month
3-Month Lookahead Upper Tumut · W18 → W30 MAY JUN JUL Civils HV cabling Protection Comms Commissioning Excavation B-line Pull cables R-A → R-D Relay test F1/F2 Fibre splicing SAT C&C window RESOURCES (auto) Linesmen Comm techs SAT-1 ≤ 21 Jun
workforce / week 22
Workforce schedule 142 WOs imported · 118 scheduled · 24 carryover Import WO CSV CLIENT VIEW DELIVERY VIEW CREW MON TUE WED THU FRI CAP Crew Alpha Linesmen · 4 pax WO-218 WO-218 WO-301 WO-301 WO-355 100% Crew Bravo Cable jointers · 3 pax WO-204 (carryover) WO-209 WO-209 WO-209 95% Crew Charlie Comm techs · 2 pax WO-411 WO-419 commissioning 75% DCAT TASK CODES CBL-PULL · 4h JNT-OH · 6h FBR-SPL · 3h RLY-SAT · 8h 24 RESEQUENCED
PREVIEW · v0.1 Workforce Planning

Volume, repeatable work - planned and scheduled at scale.

For teams receiving volume, repeatable work and turning it into a deliverable plan. Drop in the WO CSV, DCAT task codes resolve, and Strova auto-schedules against your crew rosters by location, effort and capacity. Client and internal dashboards run off the same dataset - no reconciliation between what was promised and what's actually being done.

CSV import + DCAT lookupDrop in your work order CSV. Task codes resolve from a configurable DCAT table. Crews and capacity are yours to define.
Auto-schedule, auto-resequenceSchedules by location, effort, and crew capacity. Carry-overs and changes resequence the plan dynamically - no manual reshuffle.
Two views, one datasetClient and delivery dashboards from the same data. Weekly workpack with time tracking. Full schedule register and PDF exports.

v0.1 - initial draft. We'll run a discovery session before the next iteration, the same way we did for Documents.

Free vs Professional

Start free. Upgrade when your project matures.

Free covers the operational heart of the project. Professional adds the contractual record - the part that protects your claim when it counts.

FREE FOREVER · 1 PROJECT

Operational core

Everything your site team needs to run the day-to-day.

  • Defects - full capability
  • Actions - full capability
  • Meetings - full capability
  • Documents - up to 100 files
  • Unlimited users per project
  • PDF export (standard)
PRO · $499 / PROJECT / MONTH

Contractual & compliance record

Everything above, plus the modules that protect the project.

  • Site (personnel, inductions, insurances, SWMS)
  • Transmittals (+ email BCC capture)
  • Inbox (correspondence register)
  • RFIs
  • Variations
  • Site Instructions
  • Documents - unlimited + transmittal integration
  • Branded PDF reports
  • Priority support

See it, don't read about it.

Start a free project in five minutes. Upload your defects register, raise your first action, issue your first set of minutes. Upgrade when you need the rest.